              目 錄
              1.編制依據(jù) 2
              2.分項(xiàng)工程概況 2
              3.基礎(chǔ)設(shè)計(jì)荷載取值 3
              4.基礎(chǔ)施工要求 3
              5.安裝安全要求 3
              6.安裝前的準(zhǔn)備工作 4
              7.升降機(jī)的安裝 4
              7.1外籠和吊籠的安裝: 5
              7.2電纜的安裝: 5
              7.3電氣裝置檢查: 6
              7.4吊桿安裝: 6
              7.5導(dǎo)軌架的安裝: 6
              7.6附墻架安裝: 7
              7.7對(duì)重安裝: 7
              7.8天輪和鋼絲繩安裝: 7
              7.9電纜保護(hù)架的安裝: 7
              7.10限位開關(guān)及極限開關(guān)碰鐵的安裝: 8
              8.平臺(tái)腳手架、施工通道、結(jié)構(gòu)加固 8
              8.1平臺(tái)腳手架 8
              8.2施工通道腳手架 12
              8.3結(jié)構(gòu)加固 12
              9.安裝及安全使用 14
              10.升降機(jī)的拆除 15
              11.驗(yàn)收 15
              12.附圖 16
              12.1升降機(jī)平面圖: 16
              12.2升降機(jī)基礎(chǔ)圖: 17
              12.3升降機(jī)平臺(tái)圖: 18
              12.4升降機(jī)立面圖: 19
              12.5施工通道平面圖: 20

              CONTENTS
              1. Preparation of the basis 2
              2. Sub-project 2 overview
              3. Foundation design load values of 3
              4. Foundation construction requirements 3
              5. Installation Safety Requirements 3
              6. 4 Preparation before installation
              7. Lift installation 4
              Outside the cage and the cage 7.1 installation: 5
              7.2 Cable Installation: 5
              7.3 Electrical installation inspection: 6
              7.4 Hanger Installation: 6
              7.5 installation guide frame: 6
              7.6 Wall Mounting attached: 7
              7.7 pairs of re-installation: 7
              7.8 days wheel and wire installation: 7
              7.9 cable to protect the mounting: 7
              7.10 limit switches and limit switches installed touch iron: 8
              8. Platform scaffolding, construction access, structural reinforcement 8
              8 8.1 platform scaffolding
              8.2 Construction of access scaffolding 12
              12 8.3 Structural Strengthening
              9. Installation and safe use of 14
              10. Lift the removal of 15
              11. Acceptance 15
              12. Photo 16
              12.1 Lift plan: 16
              Lift the basis of Figure 12.2: 17
              12.3 lift platform Figure: 18
              12.4 Lift Elevation: 19
              12.5 Construction of channel plan: 20